The best time to ask a structural question is while the answer can still change the sketch. An architect planning a wide opening, an addition, or a change to an existing roof may have several good options on paper. A focused review can reveal which ones deserve more development before the client starts making decisions around them.

Start with the design decision

Say you’re planning a broad opening onto a terrace. Before asking how large the beam needs to be, tell us what would make the room work: a continuous view, a flush ceiling, or no column at the center. That gives us a reason to look at where the framing might land, what can carry the load below, and which parts of the existing building still need to be verified.

The first conversation can be about one part of the project. For an agreed scope, marked-up drawings can communicate the options and questions more clearly than a broad narrative. They can also show where an answer depends on a site observation, analysis, or another consultant’s input. A schematic review does not replace final design or construction documents.

Five things to send

Incomplete records are common, especially in renovations. Sending what you have and naming what is missing gives the team a better starting point than waiting for a perfect drawing set.

See what that looks like on a project

In our residential addition case study, the glazed opening shaped the frame, its connections, and the foundations below it. If you have a similar decision ahead, tell us what you’re trying to resolve and share your next milestone.

Back to all insights