Before ordering a rooftop solar array or a replacement mechanical unit, find out what the proposed installation asks of the building. Two units with similar weights can put their loads in different places. An array that looks straightforward on a roof plan may have mounting or ballast requirements that change the structural question.
Get the proposed installation on paper
Ask the vendor for the layout, equipment weights and support locations. For solar, include the proposed mounting or ballast arrangement if it’s known. For mechanical equipment, share the proposed curb or supports and any new roof openings. A roof plan with the equipment drawn in place is far more useful than a product sheet alone.
Then gather what you know about the building: framing drawings, roof replacements, previous repairs or equipment changes, and safe access for a site visit. On an occupied building, flag any restrictions on access or disruptions early. Unknowns belong in the scope; they don’t have to stop the first conversation.
Ask what must be verified before procurement
Structural review considers how loads reach the roof framing and the rest of the structure. Depending on the project, that can include localized loads at supports, how the equipment is attached, and how the proposed installation interacts with snow and wind. Roof condition, drainage, access, and warranty questions also need coordination with the relevant team members. The U.S. Department of Energy’s commercial rooftop solar guide is a useful starting point for those conversations.
An assessment may identify a workable location, suggest that the vendor revise the layout, or flag where more investigation or reinforcement design is needed. The scope should say whether you’re getting findings for a purchase decision or design documents for the installation.
Discuss a roof upgrade. Share the vendor layout and procurement milestone. For public and institutional buildings, see Crafted’s local government work.