Designed around the demands of use.
Structural assessment, equipment support, and retrofit design for facilities adapting to new loads, upgraded systems, and changing operational needs.

Start with the loads.
Design around the operation.
An equipment upgrade can change more than the production process. It can introduce new concentrated loads, alter roof demands, or require openings in existing framing. Crafted helps facility owners and project teams understand how proposed changes affect the building structure before installation or construction proceeds.
We combine existing-condition documentation and capacity analysis with practical support and reinforcement design. Rose Kennedy’s background includes industrial retrofits, equipment supports, and rooftop-unit upgrades. Coordination with equipment suppliers, MEP engineers, and contractors helps establish the information needed for design and identify structural work that must be integrated into the installation plan.
Make informed changes
to a working facility.
Equipment & rooftop upgrades
Evaluate supporting framing for proposed equipment using project-specific loading and manufacturer information; design supports or reinforcement where required.
Existing-building capacity
Review the available records and site conditions to assess affected structural elements. Identify information gaps, constraints, and the need for further investigation before finalizing a solution.
Retrofits & structural alterations
Develop targeted reinforcement and framing modifications for new openings or revised layouts, coordinating access and construction constraints with the facility team.
From the brief to the details.
Define the operational change
Establish what is being added or altered and obtain the relevant equipment loads and layout information.
Assess the supporting structure
Review existing conditions and trace the proposed loads through the affected framing and supports.
Coordinate the retrofit
Detail the required modifications and discuss construction constraints with the owner and installation team.
A practical starting point
Bring available structural drawings, equipment specifications, proposed locations, and anticipated installation timing. These help define the assessment and distinguish work that can use existing capacity from work that needs reinforcement or additional investigation.
Led by Rose Kennedy, Principal Structural Engineer, licensed in New York, Connecticut, New Jersey, and New Hampshire. View professional credentials.
Discuss a facility upgrade.
Tell us about the project location, the scope of work, and the decisions ahead. We can discuss how structural engineering fits into the next stage.
